IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0287 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $184,606 $250,000 Not Implemented
LE0287 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $220,823 $50,000 Not Implemented
LE0287 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79,515 $8,000 Not Implemented
LE0287 # 04 Y:2009 04 2009 INSTALL TIMERS AND/OR THERMOSTATS $36,003 $650 Not Implemented
LE0287 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,644 $17,000 Not Implemented
LE0287 # 06 Y:2009 06 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $13,621 $7,167 Not Implemented
LE0287 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $1,840 Implemented
LE0287 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,998 $27,281 Not Implemented
MI0177 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,329 $2,000 Implemented
MI0177 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $31,195 $912 Not Implemented
MI0177 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,542 $16,140 Not Implemented
MI0177 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,954 $1,210 Implemented
MI0177 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,166 $40 Implemented
MI0177 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,006 $4,531 Not Implemented
MI0177 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,697 $1,210 Implemented
MI0177 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,199 $40 Implemented
MI0177 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,417 $4,531 Not Implemented
MI0177 # 10 Y:2009 10 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $8,226 $3,320 Implemented
MS0341 # 01 Y:2009 01 2009 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $42,353 $102,915 Not Implemented
MS0341 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,482 $217,200 Not Implemented
MS0341 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $38,096 Implemented
MS0341 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,747 $15,590 Implemented
MS0341 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $196 Implemented
NC0390 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $46,662 $67,500 Not Implemented
NC0390 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $871 $100 Implemented