Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2009 |
Principal Product | Adhesive labels |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 200,000 Thousand Feet |
Production Hrs. Annual | 5,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $122,574 | 3,861,840 | kWh | $0.03 |
Electricity Demand | $80,673 | 9,438 | kW-months/year | $8.55 |
Natural Gas | $212,862 | 17,486 | MMBtu | $12.17 |
TOTAL ENERGY COSTS | $416,109 | |||
RECOMMENDED SAVINGS* | $61,743 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,404 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $46,662 Cost: $67,500 |
$(-99,667) | (-3,140,111) | $(-53,452) | (-6,732) | $199,781 | 16,448 | - | - | - | - |
$(-99,667) (-3,140,111) kWh |
$(-53,452) (-6,732) kW-months/year |
$199,781 16,448 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $871 Cost: $100 |
$1,114 | 35,092 | $597 | 75 | - | - | $(-600) | - | $(-240) | - |
$1,114 35,092 kWh |
$597 75 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,075 Cost: - |
$700 | 22,046 | $375 | 47 | - | - | - | - | - | - |
$700 22,046 kWh |
$375 47 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $1,533 Cost: $50 |
$771 | 24,300 | $762 | 96 | - | - | - | - | - | - |
$771 24,300 kWh |
$762 96 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $379 Cost: $432 |
$220 | 6,927 | $159 | 20 | - | - | - | - | - | - |
$220 6,927 kWh |
$159 20 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,223 Cost: $50,369 |
$8,767 | 276,214 | $4,700 | 591 | - | - | $(-3,414) | - | $1,170 | - |
$8,767 276,214 kWh |
$4,700 591 kW-months/year |
- - MMBtu |
$(-3,414) - $ |
$1,170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,743 Cost: $118,451 |
$(-88,095) | (-2,775,532) | $(-46,859) | (-5,903) | $199,781 | 16,448 | $(-4,014) | - | $930 | - | $(-88,095) (-2,775,532) kWh |
$(-46,859) (-5,903) kW-months/year |
$199,781 16,448 MMBtu |
$(-4,014) - $ |
$930 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,404 Cost: $150 |
$1,885 | 59,392 | $1,359 | 171 | - | - | $(-600) | - | $(-240) | - | $1,885 59,392 kWh |
$1,359 171 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |