IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0126 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $725 $0 Implemented
AM0126 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $770 $320 Implemented
AM0126 # 06 Y:1991 06 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $410 $910 Implemented
AM0126 # 07 Y:1991 07 1991 PAY UTILITY BILLS ON TIME $225 $0 Implemented
AM0126 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $185 $0 Implemented
AM0127 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $317 $303 Not Implemented
AM0127 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,190 $655 Not Implemented
AM0127 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,046 $1,160 Not Implemented
AM0127 # 04 Y:1991 04 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $290 $260 Not Implemented
AM0127 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $205 $0 Not Implemented
AM0127 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $115 $75 Not Implemented
AS0028 # 01 Y:1991 01 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $16,506 $65,000 Not Implemented
AS0028 # 02 Y:1991 02 1991 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,454 $20,000 Not Implemented
AS0028 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,991 $2,375 Not Implemented
AS0028 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,039 $1,500 Not Implemented
AS0028 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $396 Not Implemented
AS0028 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $8,736 Not Implemented
AS0028 # 07 Y:1991 07 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,578 $0 Not Implemented
AS0028 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $422 $1,275 Not Implemented
AS0028 # 09 Y:1991 09 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $252 $280 Not Implemented
AS0028 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $564 $0 Not Implemented
AS0029 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $97 Implemented
OR0120 # 01 Y:1991 01 1991 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,060 $2,900 Not Implemented
OR0120 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,938 $3,000 Not Implemented
OR0120 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $1,000 $1,425 Not Implemented