IAC Assessment: AM0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1991
Principal Product CAKES AND COOKIES
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 1,720,000 Pieces
Production Hrs. Annual 2,498
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,345 1,521,981 kWh $0.07
Natural Gas $41,270 10,318 MMBtu $4.00
TOTAL ENERGY COSTS $150,615
RECOMMENDED SAVINGS* $14,052 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,052
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,450
Cost:
-
$8,450 - - - $8,450
-
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,770
Cost:
$710
$2,770 87,339 - - $2,770
87,339
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$517
Cost:
$95
$517 6,155 - - $517
6,155
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$725
Cost:
-
$1,790 34,291 $(-1,065) (-191) $1,790
34,291
kWh
$(-1,065)
(-191)
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$770
Cost:
$320
$220 7,034 $550 140 $220
7,034
kWh
$550
140
MMBtu
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$410
Cost:
$910
- - $410 98 -
-
kWh
$410
98
MMBtu
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$225
Cost:
-
$225 - - - $225
-
kWh
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$185
Cost:
-
$185 3,224 - - $185
3,224
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,052
Cost:
$2,035
$14,157 138,043 $(-105) 47 $14,157
138,043
kWh
$(-105)
47
MMBtu
TOTAL IMPLEMENTED Savings:
$14,052
Cost:
$2,035
$14,157 138,043 $(-105) 47 $14,157
138,043
kWh
$(-105)
47
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas