IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0333 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,566 $666 Not Implemented
AS0333 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,116 $3,300 Not Implemented
AS0333 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,272 $60 Implemented
AS0333 # 07 Y:2002 07 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $684 $0 Not Implemented
AS0333 # 08 Y:2002 08 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,852 $60 Not Implemented
AS0333 # 09 Y:2002 09 2002 CLEAR AND RENT EXISTING SPACE $201,600 $12,820 Not Implemented
CO0507 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,940 $68,900 Not Implemented
CO0507 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,120 $15,380 Implemented
CO0507 # 03 Y:2002 03 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,150 $7,000 Implemented
CO0507 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $817 $1,358 Implemented
CO0507 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,700 $330 Implemented
CO0507 # 06 Y:2002 06 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,540 $160 Not Implemented
IA0295 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,657 $200 Not Implemented
IA0295 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143,247 $20 Implemented
IA0295 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $416 $532 Not Implemented
IA0295 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $5,981 Not Implemented
IA0295 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $10,388 $30,450 Not Implemented
WV0247 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,772 $1,000 Not Implemented
WV0247 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,727 $80 Implemented
WV0247 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,090 $296 Not Implemented
WV0247 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,600 $0 Implemented
WV0247 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,412 $2,100 Implemented
WV0247 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $5,402 $305 Implemented
WV0247 # 07 Y:2002 07 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,312 $400 Implemented
WV0247 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,554 $970 Implemented