Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Folding cartons |
NAICS | n/a |
SIC | 2674 - Bags: Uncoated Paper & Multiwall |
Sales | $50,000,000-$100,000,000 |
# of Employees | 247 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 88,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $665,304 | 19,747,000 | kWh | $0.03 |
Electricity Demand | $277,846 | 35,156 | kW-months/year | $7.90 |
Natural Gas | $123,883 | 21,812 | MMBtu | $5.68 |
TOTAL ENERGY COSTS | $1,067,033 | |||
RECOMMENDED SAVINGS* | $62,850 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,353 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,772 Cost: $1,000 |
- | - | - | - | $4,772 | 840 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,772 840 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,727 Cost: $80 |
$2,760 | 100,237 | $967 | 12 | - | - | - | - | - | - | - | - | - | - |
$2,760 100,237 kWh |
$967 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,090 Cost: $296 |
$815 | 29,593 | $275 | 4 | - | - | - | - | - | - | - | - | - | - |
$815 29,593 kWh |
$275 4 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,600 Cost: - |
$4,188 | 152,067 | $1,412 | 18 | - | - | - | - | - | - | - | - | - | - |
$4,188 152,067 kWh |
$1,412 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $2,412 Cost: $2,100 |
$1,476 | 53,619 | $936 | 24 | - | - | - | - | - | - | - | - | - | - |
$1,476 53,619 kWh |
$936 24 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,402 Cost: $305 |
- | - | - | - | $5,402 | 951 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,402 951 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $8,312 Cost: $400 |
$6,577 | 238,795 | $2,215 | 28 | - | - | - | - | - | - | $(-480) | - | - | - |
$6,577 238,795 kWh |
$2,215 28 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$(-480) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,554 Cost: $970 |
$1,162 | 42,192 | $392 | 5 | - | - | - | - | - | - | - | - | - | - |
$1,162 42,192 kWh |
$392 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $346 Cost: $2,010 |
$153 | 5,567 | $193 | 2 | - | - | - | - | - | - | - | - | - | - |
$153 5,567 kWh |
$193 2 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,136 Cost: $2,744 |
- | - | - | - | $1,136 | 715 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,136 715 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $396 Cost: $956 |
- | - | - | - | - | - | - | - | $396 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$396 - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $14,103 Cost: $7,000 |
- | - | - | - | - | - | $14,103 | 2,520,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,103 2,520,000 Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $14,000 Cost: $6,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $14,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
$14,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,850 Cost: $23,861 |
$17,131 | 622,070 | $6,390 | 93 | $11,310 | 2,506 | $14,103 | 2,520,000 | $396 | - | $(-480) | - | $14,000 | - | $17,131 622,070 kWh |
$6,390 93 kW-months/year |
$11,310 2,506 MMBtu |
$14,103 2,520,000 Tgal |
$396 - gal |
$(-480) - $ |
$14,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,353 Cost: $5,865 |
$16,316 | 592,477 | $6,115 | 89 | $5,402 | 951 | - | - | - | - | $(-480) | - | - | - | $16,316 592,477 kWh |
$6,115 89 kW-months/year |
$5,402 951 MMBtu |
- - Tgal |
- - gal |
$(-480) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Administrative Changes |