IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0400 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,063 $712 Not Implemented
SF0400 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $6,271 $2,850 Not Implemented
SF0400 # 05 Y:2011 05 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,251 $66,975 Not Implemented
SF0400 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $9,933 $14,699 Not Implemented
SF0400 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,404 $22,616 Not Implemented
SF0400 # 08 Y:2011 08 2011 OPTIMIZE PLANT POWER FACTOR $5,731 $15,119 Not Implemented
SF0400 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,700 $41,732 Not Implemented
SF0400 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,990 $67,329 Not Implemented
SF0400 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,158 $170,718 Not Implemented
SF0400 # 12 Y:2011 12 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $171,695 $1,807,809 Not Implemented
UM0388 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,000 $12,500 Not Implemented
UM0388 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,157 $33,210 Not Implemented
UM0388 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $1,638 $2,460 Not Implemented
UM0388 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $21,289 $1,000 Not Implemented
UM0388 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,941 $5,520 Not Implemented
UM0388 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $13,164 $14,196 Not Implemented
UW0054 # 01 Y:2011 01 2011 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $25,410 $190,516 Not Implemented
UW0054 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,537 $50,000 Not Implemented
UW0054 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,619 $2,700 Not Implemented
NC0426 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,495 $2,825 Not Implemented
NC0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $1,530 Implemented
NC0426 # 03 Y:2011 03 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,690 $3,750 Not Implemented
NC0426 # 04 Y:2011 04 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,171 $4,700 Not Implemented
NC0426 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $302 $25 Implemented
NC0426 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $100 Implemented