IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0047 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $2,848 $798 Not Implemented
IP0047 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,543 $900 Not Implemented
IP0047 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,968 $623 Not Implemented
IP0047 # 05 Y:2015 05 2015 APPLY FOR INVESTMENT INCENTIVES $30,801 $10,000 Implemented
IP0047 # 06 Y:2015 06 2015 APPLY FOR INVESTMENT INCENTIVES $10,288 $5,000 Implemented
IP0047 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $380 Not Implemented
IP0047 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $20,898 Not Implemented
IP0047 # 09 Y:2015 09 2015 OPTIMIZE PLANT POWER FACTOR $5,199 $23,927 Not Implemented
IP0046 # 01 Y:2015 01 2015 UPGRADE OBSOLETE EQUIPMENT $1,665 $4 Not Implemented
IP0046 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $64 Not Implemented
IP0046 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $122 $117 Not Implemented
IP0046 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,526 $4,032 Not Implemented
IP0046 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $348 $512 Not Implemented
IP0046 # 06 Y:2015 06 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,619 $10,141 Not Implemented
IP0045 # 01 Y:2015 01 2015 APPLY FOR INVESTMENT INCENTIVES $1,605 $0 Implemented
IP0045 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $0 Implemented
IP0045 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $25,783 $1,054 Implemented
IP0045 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $417 Implemented
IP0045 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,201 $17,250 Implemented
IP0044 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,883 $78 Implemented
IP0044 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,267 $486 Not Implemented
IP0044 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $145 $57 Not Implemented
IP0044 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,489 $10,430 Not Implemented
IP0044 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $269 $520 Not Implemented
IP0043 # 01 Y:2015 01 2015 USE OPTIMUM TEMPERATURE $3,192 $0 Not Implemented