Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0492 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,697 | $338 | Implemented |
WV0492 # 09 Y:2014 | 09 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $811 | $30 | Not Implemented |
WV0492 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $1,916 | Implemented |
WV0492 # 11 Y:2014 | 11 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $482 | $356 | Implemented |
WV0492 # 12 Y:2014 | 12 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $185 | $700 | Implemented |
LE0376 # 01 Y:2014 | 01 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,425 | $1,330 | Not Implemented |
LE0376 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,341 | $2,500 | Not Implemented |
LE0376 # 03 Y:2014 | 03 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,711 | $3,192 | Not Implemented |
LE0376 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,614 | $673 | Not Implemented |
LE0376 # 05 Y:2014 | 05 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $2,157 | $1,170 | Implemented |
LE0376 # 06 Y:2014 | 06 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,081 | $10,500 | Implemented |
LE0376 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,223 | $1,830 | Not Implemented |
LE0376 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,345 | $17,700 | Implemented |
LE0376 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $3,381 | $11,736 | Implemented |
LE0376 # 10 Y:2014 | 10 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $42,779 | $169,000 | Not Implemented |
LE0376 # 11 Y:2014 | 11 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,052 | $20,066 | Implemented |
LE0377 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $766 | $55 | Not Implemented |
LE0377 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,849 | $1,000 | Not Implemented |
LE0377 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,479 | $55,500 | Not Implemented |
LE0377 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,376 | $1,950 | Not Implemented |
LE0377 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,464 | $1,700 | Not Implemented |
LE0377 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $4,000 | Not Implemented |
LE0375 # 01 Y:2014 | 01 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,302 | $0 | Not Implemented |
LE0375 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,973 | $1,000 | Not Implemented |
LE0375 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $794 | $450 | Not Implemented |