Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $125 | Implemented |
UU0008 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $423 | $400 | Implemented |
UU0008 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,204 | $460 | Implemented |
UU0008 # 04 Y:2001 | 04 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,102 | $2,600 | Implemented |
UU0008 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,236 | $1,844 | Not Implemented |
UU0007 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,319 | $5,852 | n/a |
UU0007 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,545 | $7,155 | n/a |
UU0007 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $430 | $430 | Implemented |
UU0007 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $564 | $400 | Not Implemented |
UU0007 # 05 Y:2001 | 05 | 2001 | RECOVER AND REUSE COOLING WATER | $953 | $20 | Not Implemented |
CO0486 # 01 Y:2001 | 01 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $298,800 | $962,500 | Not Implemented |
CO0486 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105,800 | $28,000 | n/a |
CO0486 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $22,640 | $68,400 | Not Implemented |
CO0486 # 04 Y:2001 | 04 | 2001 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $7,590 | $10,000 | Not Implemented |
CO0486 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,140 | $21,600 | n/a |
CO0486 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $2,490 | $6,000 | Not Implemented |
UU0005 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,950 | $280 | Implemented |
UU0005 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $798 | $932 | Implemented |
UU0005 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,396 | $300 | Not Implemented |
UU0005 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,070 | $10,000 | Not Implemented |
UU0005 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $612 | $1,575 | Not Implemented |
CO0485 # 01 Y:2001 | 01 | 2001 | INSULATE BARE EQUIPMENT | $229,700 | $118,560 | Implemented |
CO0485 # 02 Y:2001 | 02 | 2001 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $59,590 | $30,000 | n/a |
CO0485 # 03 Y:2001 | 03 | 2001 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $40,450 | $30,000 | Not Implemented |
CO0485 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $27,060 | $28,000 | Implemented |