IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0185 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,577 $1,200 Not Implemented
WI0185 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,819 $0 Not Implemented
WI0185 # 10 Y:1993 10 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,596 $5,600 Not Implemented
WI0185 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,588 $5,000 Not Implemented
WI0185 # 12 Y:1993 12 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,112 $2,455 Not Implemented
KU0404 # 01 Y:1993 01 1993 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $10,634 $11,960 Implemented
KU0404 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $8,930 Implemented
KU0404 # 03 Y:1993 03 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $663 $0 Implemented
KU0404 # 04 Y:1993 04 1993 USE OPTIMUM THICKNESS INSULATION $5,818 $3,721 Not Implemented
KU0404 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,106 $1,350 Implemented
KU0404 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $780 Implemented
KU0404 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $518 $678 Implemented
KU0404 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $186 $0 Implemented
HO0051 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,441 $7,564 Implemented
HO0051 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $7,715 Implemented
HO0051 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,993 $3,250 Implemented
HO0051 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $300 Not Implemented
HO0052 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $540 Not Implemented
HO0052 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $3,402 Not Implemented
HO0052 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $599 $1,517 Not Implemented
HO0052 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,681 $26,880 Not Implemented
HO0052 # 05 Y:1993 05 1993 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,393 $100 Not Implemented
HO0052 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,891 $1,300 Not Implemented
HO0053 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,063 $8,771 Implemented
HO0053 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,598 $6,829 Implemented