IAC Assessment: WI0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1993
Principal Product Automobile Service Equipment
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $50,000,000-$100,000,000
# of Employees 247
Plant Area (Sq.Ft.) 400,000
Annual Production 0 Units
Production Hrs. Annual 5,225
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $552,342 6,968,347 kWh $0.08
Natural Gas $149,082 41,588 MMBtu $3.58
TOTAL ENERGY COSTS $701,424
RECOMMENDED SAVINGS* $67,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,624
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,039
Cost:
-
$21,039 - - - $21,039
-
kWh
-
-
MMBtu
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,773
Cost:
-
$2,773 - - - $2,773
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,604
Cost:
$77,000
$18,604 234,760 - - $18,604
234,760
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,556
Cost:
$2,336
$1,556 19,637 - - $1,556
19,637
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,295
Cost:
-
$2,295 29,015 - - $2,295
29,015
kWh
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,859
Cost:
$900
$3,859 48,652 - - $3,859
48,652
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,407
Cost:
-
$8,407 106,096 - - $8,407
106,096
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,577
Cost:
$1,200
- - $2,577 720 -
-
kWh
$2,577
720
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,819
Cost:
-
$1,819 22,860 - - $1,819
22,860
kWh
-
-
MMBtu
10: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,596
Cost:
$5,600
$1,596 20,223 - - $1,596
20,223
kWh
-
-
MMBtu
11: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,588
Cost:
$5,000
- - $1,588 444 -
-
kWh
$1,588
444
MMBtu
12: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,112
Cost:
$2,455
- - $1,112 311 -
-
kWh
$1,112
311
MMBtu
TOTAL RECOMMENDED Savings:
$67,225
Cost:
$94,491
$61,948 481,243 $5,277 1,475 $61,948
481,243
kWh
$5,277
1,475
MMBtu
TOTAL IMPLEMENTED Savings:
$6,624
Cost:
$2,336
$6,624 48,652 - - $6,624
48,652
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas