IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0147 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,540 $15 Implemented
IP0147 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,380 $115 Implemented
IP0147 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,949 $4,080 Implemented
IP0147 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,770 $3,499 Implemented
IP0147 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39 $90 Implemented
BS0147 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,246 $7,983 Not Implemented
BS0147 # 02 Y:2021 02 2021 INSTALL AUTOMATIC PACKING EQUIPMENT $10,717 $50,361 Not Implemented
BS0147 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $386 $882 Not Implemented
BS0147 # 04 Y:2021 04 2021 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,755 $0 Not Implemented
CL2107 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,074 $19,482 n/a
CL2107 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,152 $2,480 n/a
CL2107 # 03 Y:2021 03 2021 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $950 $4,500 n/a
CL2107 # 04 Y:2021 04 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,390 $0 n/a
UA0240 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,059 $800 Implemented
UA0240 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $8,528 $60,000 Implemented
UA0240 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,894 $9,682 Implemented
MI0387 # 01 Y:2021 01 2021 AIR CONDITION ONLY SPACE NECESSARY $12,419 $16,940 Implemented
MI0387 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $4,326 $10,320 Not Implemented
MI0387 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,862 $9,016 Not Implemented
MI0387 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $4,308 Implemented
MI0387 # 05 Y:2021 05 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,971 $11,975 Not Implemented
MI0387 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,824 $120 Implemented
MI0387 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $1,980 Implemented
MI0387 # 08 Y:2021 08 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,060 $2,791 Not Implemented
MI0387 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,412 $780 Implemented