Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,855
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0037 # 04 Y:1985 | 04 | 1985 | INSTALL TURBULATORS | $2,037 | $1,200 | Not Implemented |
CO0037 # 05 Y:1985 | 05 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $293 | $150 | Not Implemented |
CO0037 # 06 Y:1985 | 06 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,718 | $960 | Implemented |
CO0037 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $2,299 | $1,000 | Implemented |
CO0037 # 08 Y:1985 | 08 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,507 | $812 | Not Implemented |
TS0026 # 01 Y:1985 | 01 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,637 | $3,240 | Not Implemented |
TS0026 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $325 | $460 | Not Implemented |
TS0026 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,640 | $503 | Not Implemented |
TS0026 # 04 Y:1985 | 04 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,372 | $400 | Not Implemented |
TS0027 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $216 | Not Implemented |
TS0027 # 02 Y:1985 | 02 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,348 | $3,929 | Not Implemented |
TS0027 # 03 Y:1985 | 03 | 1985 | INSTALL STORM WINDOWS AND DOORS | $916 | $1,275 | Not Implemented |
TS0027 # 04 Y:1985 | 04 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $555 | $500 | Not Implemented |
TS0027 # 05 Y:1985 | 05 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,684 | $0 | Not Implemented |
TS0027 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $104 | $0 | Not Implemented |
TN0257 # 01 Y:1985 | 01 | 1985 | USE HEAT PUMP FOR SPACE CONDITIONING | $17,233 | $429,000 | Not Implemented |
TN0257 # 02 Y:1985 | 02 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,904 | $37,200 | Not Implemented |
TN0257 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $3,102 | $200 | Not Implemented |
TN0257 # 04 Y:1985 | 04 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,915 | $0 | Not Implemented |
TN0257 # 05 Y:1985 | 05 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,048 | $450 | Implemented |
TN0260 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,755 | $0 | Implemented |
TN0260 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,155 | $300 | Not Implemented |
TN0260 # 03 Y:1985 | 03 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $696 | $200 | Not Implemented |
TN0260 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $533 | $300 | Not Implemented |
TN0262 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,702 | $0 | Implemented |