IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0533 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,088 $25,965 Implemented
SF0533 # 09 Y:2019 09 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,925 $3,138 Implemented
SF0533 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,765 $2,729 Implemented
SF0533 # 11 Y:2019 11 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,111 $11,016 Implemented
SF0533 # 12 Y:2019 12 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,093 $93,629 Implemented
SF0532 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $879 $0 Implemented
SF0532 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,844 $20,718 Implemented
SF0532 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $2,762 $4,681 Not Implemented
SF0532 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $1,777 $4,972 Not Implemented
SF0532 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $2,757 Implemented
SF0532 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,025 $8,491 Implemented
SF0532 # 07 Y:2019 07 2019 REPLACE BOILER $20,414 $108,576 Implemented
SF0531 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,894 $0 Not Implemented
SF0531 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $88,691 $23,292 Not Implemented
SF0531 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,968 $3,477 Not Implemented
SF0531 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,498 $886 Not Implemented
SF0531 # 05 Y:2018 05 2018 INSTALL STEAM TRAP $9,614 $6,613 Not Implemented
SF0531 # 06 Y:2018 06 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $20,839 $15,682 Not Implemented
SF0531 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,404 $82,459 Not Implemented
SF0531 # 08 Y:2018 08 2018 REPAIR AND ELIMINATE STEAM LEAKS $18,580 $32,000 Not Implemented
SF0531 # 09 Y:2018 09 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $15,854 $35,361 Not Implemented
SD0574 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,259 $0 Implemented
SD0574 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $886 $300 Implemented
SD0574 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $485 $1,290 Not Implemented
SD0574 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Not Implemented