Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2021 |
Principal Product | Malt Products |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $10,000,000-$50,000,000 |
# of Employees | 144 |
Plant Area (Sq.Ft.) | 68,255 |
Annual Production | 3,100 Thousand Gallons |
Production Hrs. Annual | 4,750 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $186,139 | 1,808,852 | kWh | $0.10 |
Electricity Demand | $253,987 | 6,034 | kW-months/year | $42.10 |
Electricity Fees | $64,576 | - | $ | - |
Natural Gas | $206,065 | 25,885 | MMBtu | $7.96 |
TOTAL ENERGY COSTS | $710,767 | |||
RECOMMENDED SAVINGS* | $77,403 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,161 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5194 REDESIGN PROCESS |
Savings: $39,942 Cost: $13,000 |
$25,594 | 248,726 | $14,348 | 341 | - | - | - | - |
$25,594 248,726 kWh |
$14,348 341 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,879 Cost: $12,356 |
$5,723 | 55,617 | $5,906 | 140 | $250 | - | - | - |
$5,723 55,617 kWh |
$5,906 140 kW-months/year |
$250 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,826 Cost: $9,545 |
$2,372 | 23,054 | $2,454 | 58 | - | - | - | - |
$2,372 23,054 kWh |
$2,454 58 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $957 Cost: - |
$957 | 9,297 | - | - | - | - | - | - |
$957 9,297 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,530 Cost: $9,245 |
$825 | 8,016 | $1,705 | 41 | - | - | - | - |
$825 8,016 kWh |
$1,705 41 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,883 Cost: $2,800 |
$614 | 5,967 | $1,269 | 30 | - | - | - | - |
$614 5,967 kWh |
$1,269 30 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $14,829 Cost: $44,568 |
- | - | - | - | - | - | $14,829 | 1,863 |
- - kWh |
- - kW-months/year |
- - $ |
$14,829 1,863 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $557 Cost: $1,000 |
- | - | - | - | - | - | $557 | 70 |
- - kWh |
- - kW-months/year |
- - $ |
$557 70 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,403 Cost: $92,514 |
$36,085 | 350,677 | $25,682 | 610 | $250 | - | $15,386 | 1,933 | $36,085 350,677 kWh |
$25,682 610 kW-months/year |
$250 - $ |
$15,386 1,933 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,161 Cost: $35,901 |
$34,646 | 336,694 | $22,708 | 539 | $250 | - | $557 | 70 | $34,646 336,694 kWh |
$22,708 539 kW-months/year |
$250 - $ |
$557 70 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |