IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0308 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $470 Implemented
TN0308 # 07 Y:1987 07 1987 OPTIMIZE PLANT POWER FACTOR $1,764 $6,800 Implemented
TN0309 # 01 Y:1987 01 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,793 $2,480 Implemented
TN0309 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $165 Implemented
TN0309 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $2,495 $0 Not Implemented
TN0309 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $470 Implemented
TN0309 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $300 Implemented
RU0001 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,628 $376 Implemented
RU0001 # 02 Y:1987 02 1987 COVER OPEN TANKS $3,290 $200 Not Implemented
RU0001 # 03 Y:1987 03 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $822 $31 Implemented
RU0001 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
RU0001 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,551 $0 Implemented
RU0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $22,514 $0 Implemented
RU0002 # 02 Y:1987 02 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,280 $32,000 Implemented
RU0002 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,433 $5,670 Implemented
RU0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $178 Implemented
RU0002 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $9,437 $6,204 Not Implemented
RU0002 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,751 $0 Implemented
LT0083 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $20,800 $4,000 Implemented
LT0083 # 02 Y:1987 02 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $12,143 $0 Not Implemented
LT0083 # 03 Y:1987 03 1987 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,820 $2,000 Implemented
LT0084 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $7,910 $39,000 Implemented
LT0084 # 02 Y:1987 02 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $420 $0 Implemented
LT0084 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $0 Not Implemented
LT0084 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $8,200 $1,200 Implemented