IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0051 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $467 $503 Implemented
OR0051 # 07 Y:1989 07 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,450 $8,000 Not Implemented
OR0051 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $2,544 $5,400 Not Implemented
OR0052 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $880 $0 Implemented
OR0052 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $2,541 $0 Implemented
OR0052 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,550 $2,400 Implemented
OR0052 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $411 $320 Not Implemented
OR0052 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,363 $500 Implemented
OR0052 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $375 $385 Not Implemented
OR0052 # 07 Y:1989 07 1989 REPAIR OR REPLACE STEAM TRAPS $8,216 $10,500 Implemented
OR0052 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $259 $395 Implemented
RU0050 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $221 $159 Not Implemented
RU0050 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Implemented
RU0050 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $173 $600 Not Implemented
RU0050 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $272 $0 Implemented
RU0050 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,484 $1,000 Not Implemented
RU0050 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,367 $1,440 Not Implemented
RU0051 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,065 $18,865 Implemented
RU0051 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,476 $320 Implemented
RU0051 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,518 $5,800 Implemented
RU0051 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $3,207 $800 Not Implemented
RU0051 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,129 $302 Implemented
RU0051 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,508 $7,568 Implemented
RU0051 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $382 $500 Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented