IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0352 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,068 $1,885 Implemented
LL0352 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,510 $1,838 Not Implemented
LL0352 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,154 $30 Implemented
LL0352 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $12 $11 Not Implemented
LL0352 # 10 Y:2011 10 2011 INSULATE BARE EQUIPMENT $8 $8 Not Implemented
TT0070 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,235 $0 Not Implemented
TT0070 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $7,025 $2,100 Not Implemented
TT0070 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $1,990 $1,600 Not Implemented
TT0070 # 04 Y:2011 04 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,200 Not Implemented
TT0070 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,337 $21,600 Not Implemented
TT0070 # 06 Y:2011 06 2011 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,730 $4,900 Not Implemented
TT0070 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $6,582 $32,600 Not Implemented
TT0070 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,486 $102,000 Not Implemented
TT0070 # 09 Y:2011 09 2011 DEVELOP A REPAIR/REPLACE POLICY $5,985 $1,347 Not Implemented
SF0399 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $14,389 $0 Implemented
SF0399 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,958 $20,025 Not Implemented
SF0399 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,432 $962 Implemented
SF0399 # 04 Y:2011 04 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $347 $393 Implemented
SF0399 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $42,675 $101,238 Not Implemented
SF0399 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $835 $2,209 Not Implemented
SF0399 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,028 $4,855 Not Implemented
SF0399 # 08 Y:2011 08 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,982 $112,500 Not Implemented
SF0399 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,758 $307,524 Implemented
SF0399 # 10 Y:2011 10 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,800 $37,014 Not Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented