Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,371
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0007 # 10 Y:1984 | 10 | 1984 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,029 | $25 | Implemented |
TN0219 # 01 Y:1984 | 01 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,852 | $3,879 | Not Implemented |
TN0219 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,107 | $600 | Not Implemented |
TN0219 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,381 | $30 | Not Implemented |
TN0219 # 04 Y:1984 | 04 | 1984 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $922 | $300 | Not Implemented |
TN0219 # 05 Y:1984 | 05 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $98 | $0 | Not Implemented |
TN0220 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,500 | $29,700 | Not Implemented |
TN0220 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $35,035 | $750 | Implemented |
TN0220 # 03 Y:1984 | 03 | 1984 | USE OPTIMUM THICKNESS INSULATION | $23,700 | $4,570 | Implemented |
TN0220 # 04 Y:1984 | 04 | 1984 | INSTALL SET-BACK TIMERS | $18,780 | $0 | Not Implemented |
TN0220 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $6,330 | $400 | Implemented |
TN0220 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $680 | $250 | Implemented |
TN0220 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $226 | $0 | Implemented |
TS0003 # 01 Y:1984 | 01 | 1984 | MINIMIZE WATER USAGE | $3,197 | $6 | Implemented |
TS0003 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,050 | $1,400 | Implemented |
TS0003 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $541 | $0 | Not Implemented |
TS0003 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $11,700 | $25,770 | Not Implemented |
TS0003 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,190 | $400 | Implemented |
TS0003 # 06 Y:1984 | 06 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,500 | $500 | Implemented |
MA0001 # 01 Y:1984 | 01 | 1984 | REPAIR OR REPLACE STEAM TRAPS | $1,657 | $30 | Implemented |
MA0001 # 02 Y:1984 | 02 | 1984 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,057 | $2,345 | Implemented |
MA0001 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $11,268 | $22,400 | Implemented |
MA0004 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,079 | $228 | Implemented |
MA0004 # 02 Y:1984 | 02 | 1984 | INSTALL SET-BACK TIMERS | $5,293 | $500 | Implemented |
MA0004 # 03 Y:1984 | 03 | 1984 | REDUCE VENTILATION AIR | $33,473 | $1,896 | Implemented |