IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0049 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,537 $2,000 Not Implemented
HO0049 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $149 $224 Not Implemented
HO0049 # 06 Y:1993 06 1993 OPTIMIZE PLANT POWER FACTOR $12,954 $9,630 Implemented
HO0050 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,748 $2,605 Implemented
HO0050 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,764 $3,483 Implemented
HO0050 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $285 Implemented
HO0050 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $300 Implemented
HO0050 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $67 $204 Implemented
HO0050 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $40 Implemented
UD0410 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $2,250 $2,250 Not Implemented
UD0410 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $0 $0 Not Implemented
UD0410 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,000 $12,000 Implemented
UD0410 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,156 $5,156 Implemented
UD0410 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,462 $22,462 Implemented
UD0410 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $2,630 Not Implemented
UD0410 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $4,650 Not Implemented
AS0093 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,214 $0 Implemented
AS0093 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,684 $6,300 Implemented
AS0093 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $421 $710 Implemented
AS0093 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,008 $250 Implemented
AS0093 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $672 $656 Implemented
AS0093 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,979 $0 Implemented
AS0093 # 07 Y:1993 07 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $257 $560 Not Implemented
AS0093 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $2,541 $2,131 Not Implemented
UF0071 # 01 Y:1993 01 1993 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $626,778 $1,320,000 Not Implemented