IAC logo
IAC Assessment: UF0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1993
Principal Product Gypsum Wallboard
NAICS n/a
SIC 3275 - Gypsum Products
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 500,000
Annual Production 38,000 Tons
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $758,157 11,398,300 kWh $0.07
Natural Gas $1,252,538 615,017 MMBtu $2.04
TOTAL ENERGY COSTS $2,010,695
RECOMMENDED SAVINGS* $697,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,794
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$626,778
Cost:
$1,320,000
- - $626,778 - -
-
kWh
$626,778
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$33,681
Cost:
$40,138
$33,681 502,638 - - $33,681
502,638
kWh
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$23,794
Cost:
$15,169
$23,794 355,217 - - $23,794
355,217
kWh
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,517
Cost:
$1,550
$9,517 142,145 - - $9,517
142,145
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,173
Cost:
$1,156
$2,173 32,532 - - $2,173
32,532
kWh
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$306
Cost:
$448
$306 5,862 - - $306
5,862
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$630
Cost:
$1,779
$630 9,379 - - $630
9,379
kWh
-
-
$
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$310
Cost:
$1,150
$310 4,689 - - $310
4,689
kWh
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$317
Cost:
$1,000
$317 6,155 - - $317
6,155
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$697,506
Cost:
$1,382,390
$70,728 1,058,617 $626,778 - $70,728
1,058,617
kWh
$626,778
-
$
TOTAL IMPLEMENTED Savings:
$36,794
Cost:
$44,223
$36,794 549,238 - - $36,794
549,238
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes