IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1077 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,559 $9,108 Not Implemented
OR0755 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,233 $0 Not Implemented
OR0755 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,881 $0 Not Implemented
OR0755 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,555 $0 Not Implemented
OR0755 # 04 Y:2022 04 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,507,357 $45,058 Not Implemented
OR0755 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,503 $23,536 Not Implemented
OR0755 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $13,297 $55,141 Not Implemented
OR0755 # 07 Y:2022 07 2022 REPLACE BOILER $3,641,663 $6,124,080 Not Implemented
MU0016 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,095 $14,729 Implemented
MU0016 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,017 $4,982 Not Implemented
MU0016 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,374 $360 Implemented
MU0016 # 04 Y:2022 04 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $567 $0 Implemented
MU0016 # 05 Y:2022 05 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $156 $0 Not Implemented
MU0016 # 06 Y:2022 06 2022 PAY BILLS ON TIME TO AVOID LATE FEES $122 $0 Implemented
MU0016 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $115 $0 Not Implemented
MU0016 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $15 $39 Implemented
UU0205 # 01 Y:2022 01 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,629 $10,629 Not Implemented
UU0205 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $10,548 $18,900 Not Implemented
UU0205 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,310 $28,263 Not Implemented
UU0205 # 04 Y:2022 04 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,404 $9,200 Not Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UU0205 # 06 Y:2022 06 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,070 $150 Not Implemented
UU0205 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $720 Not Implemented
MS0401 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,376 $6,600 Not Implemented
MS0401 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $253 $570 Not Implemented