Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0747 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,756 | $0 | Not Implemented |
OK0747 # 04 Y:2007 | 04 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,099 | $0 | Not Implemented |
OK0747 # 05 Y:2007 | 05 | 2007 | USE SOLAR HEAT FOR HEAT | $14,978 | $138,320 | Not Implemented |
OK0747 # 06 Y:2007 | 06 | 2007 | INSTALL SKYLIGHTS | $22,903 | $139,000 | Not Implemented |
OK0747 # 07 Y:2007 | 07 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Not Implemented |
OK0745 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,891 | $360 | Implemented |
OK0745 # 02 Y:2007 | 02 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $57,727 | $3,600 | Not Implemented |
OK0745 # 03 Y:2007 | 03 | 2007 | INSULATE BARE EQUIPMENT | $13,884 | $4,859 | Implemented |
OK0745 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $2,384 | $744 | Not Implemented |
OK0745 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,437 | $1,574 | Not Implemented |
OK0745 # 06 Y:2007 | 06 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,998 | $9,010 | Not Implemented |
OK0745 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,171 | $81,808 | Not Implemented |
OK0745 # 08 Y:2007 | 08 | 2007 | OPTIMIZE PLANT POWER FACTOR | $1,509 | $6,760 | Not Implemented |
OK0745 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,516 | $7,600 | Not Implemented |
OK0745 # 10 Y:2007 | 10 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $609 | $3,125 | Not Implemented |
OK0745 # 11 Y:2007 | 11 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $37,616 | $286,361 | Implemented |
OK0744 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,427 | $8,720 | Not Implemented |
OK0744 # 02 Y:2007 | 02 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $34,603 | $3,729 | Not Implemented |
OK0744 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,080 | $360 | Not Implemented |
OK0744 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,247 | $2,398 | Not Implemented |
OK0744 # 05 Y:2007 | 05 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $800 | $0 | Not Implemented |
OK0743 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,720 | $5,010 | Implemented |
OK0743 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,189 | $569 | Implemented |
OK0743 # 03 Y:2007 | 03 | 2007 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $642 | $6,000 | Implemented |
OK0743 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,598 | $3,500 | Implemented |