IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0190 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $190,648 $100,000 Implemented
AS0190 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $3,954 $1,150 Not Implemented
AS0190 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $10,501 $200 Implemented
GT0596 # 01 Y:1996 01 1996 COMBINE UTILITY METERS $3,080 $5,000 Not Implemented
GT0596 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $19,400 $0 Implemented
GT0596 # 03 Y:1996 03 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,000 $41,250 Implemented
GT0596 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,410 $200 Implemented
GT0596 # 05 Y:1996 05 1996 USE LESS WASTEFUL PACKAGING $58,140 $38,250 Not Implemented
GT0596 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,576 $3,850 Not Implemented
GT0596 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $940 $5,130 Not Implemented
AR0089 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,855 $7,290 Implemented
AR0089 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $509 $100 Not Implemented
AR0089 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $196 $75 Implemented
AR0089 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $359 $161 Not Implemented
AR0089 # 05 Y:1996 05 1996 MAINTAIN MACHINES TO REDUCE LEAKS $3,650 $300 Implemented
IA0157 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,211 $6,599 Implemented
IA0157 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $465 $516 Implemented
IA0157 # 03 Y:1996 03 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $945 $260 Not Implemented
IA0157 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $971 $2,560 Implemented
IA0157 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $697 $222 Implemented
IA0157 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $623 $160 Implemented
IA0157 # 07 Y:1996 07 1996 OPTIMIZE PLANT POWER FACTOR $11,884 $22,134 Implemented
IA0157 # 08 Y:1996 08 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $6,291 $0 Not Implemented
IA0157 # 09 Y:1996 09 1996 IMPROVE HANDLING PRACTICES $5,008 $2,000 Implemented
MA0371 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $71,639 $68,000 Not Implemented