IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0487 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,545 $0 Not Implemented
SF0487 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $2,132 $534 Not Implemented
SF0487 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,944 $11,650 Not Implemented
SF0487 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,738 $17,574 Implemented
SF0487 # 06 Y:2016 06 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,794 $3,610 Not Implemented
SF0487 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $7,137 $27,407 Not Implemented
OK0945 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $23,818 $29,535 Not Implemented
OK0945 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,229 $0 Not Implemented
OK0945 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,559 $26,380 Implemented
OK0945 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $14,580 $10,000 Not Implemented
SU0414 # 01 Y:2016 01 2016 ELIMINATE/REDUCE AN OPERATION $793 $0 Implemented
SU0414 # 02 Y:2016 02 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $699 $0 Implemented
SU0414 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $283 $0 Implemented
SU0414 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $124 $0 Implemented
SU0414 # 05 Y:2016 05 2016 ELIMINATE/REDUCE AN OPERATION $8,880 $4,360 Not Implemented
SU0414 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $1,286 $1,309 Implemented
SU0414 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $493 $691 Implemented
SU0414 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $46 $90 Not Implemented
SU0414 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $2,253 Not Implemented
SU0414 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $378 $803 Not Implemented
SU0414 # 11 Y:2016 11 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $153 $359 Implemented
SU0414 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,446 $6,536 Not Implemented
MI0299 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,996 $70,000 Not Implemented
MI0299 # 02 Y:2016 02 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $10,788 $66,330 Not Implemented
MI0299 # 03 Y:2016 03 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,688 $320 Implemented