Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0191 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,696 | $0 | Not Implemented |
DL0191 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,827 | $0 | Not Implemented |
DL0191 # 03 Y:2021 | 03 | 2021 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,622 | $600 | Not Implemented |
DL0191 # 04 Y:2021 | 04 | 2021 | INSTALL / REPAIR INSULATION ON STEAM LINES | $818 | $168 | Not Implemented |
DL0191 # 05 Y:2021 | 05 | 2021 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $5,413 | $1,000 | Not Implemented |
DL0191 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,208 | $38 | Not Implemented |
DL0191 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,032 | $4,500 | Not Implemented |
DL0191 # 08 Y:2021 | 08 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $687 | $333 | Not Implemented |
DL0191 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,391 | $1,527 | Not Implemented |
DL0191 # 10 Y:2021 | 10 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,846 | $1,500 | Not Implemented |
DL0191 # 11 Y:2021 | 11 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,536 | $925 | Not Implemented |
DL0191 # 12 Y:2021 | 12 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,502 | $22,000 | Not Implemented |
TT0253 # 01 Y:2021 | 01 | 2021 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $63,457 | $40,000 | Implemented |
TT0253 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,898 | $70,582 | Implemented |
TT0253 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,036 | $3,000 | Not Implemented |
TT0253 # 04 Y:2021 | 04 | 2021 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,829 | $1,408 | Not Implemented |
TT0253 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $479 | $900 | Implemented |
TT0253 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $395 | $40 | Not Implemented |
TT0253 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $281 | $500 | Implemented |
TT0253 # 08 Y:2021 | 08 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $245 | $25 | Implemented |
SU0504 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $97 | $0 | Not Implemented |
SU0504 # 02 Y:2021 | 02 | 2021 | ELIMINATE/REDUCE AN OPERATION | $515 | $50 | Not Implemented |
SU0504 # 03 Y:2021 | 03 | 2021 | REDUCE VENTILATION AIR | $1,725 | $882 | Not Implemented |
SU0504 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $421 | $569 | Not Implemented |
SU0504 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $211 | $371 | Not Implemented |