Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0253 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $395 $40 Not Implemented
TT0253 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $500 Implemented
TT0253 # 08 Y:2021 08 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $245 $25 Implemented
OK1046 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,296 $2,422 Not Implemented
OK1046 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $827 $0 Implemented
OK1046 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $569 $512 Not Implemented
OK1046 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $2,125 $8,240 Not Implemented
OK1046 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,027 $38,688 Implemented
DL0191 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,696 $0 Not Implemented
DL0191 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,827 $0 Not Implemented
DL0191 # 03 Y:2021 03 2021 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,622 $600 Not Implemented
DL0191 # 04 Y:2021 04 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $818 $168 Not Implemented
DL0191 # 05 Y:2021 05 2021 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $5,413 $1,000 Not Implemented
DL0191 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,208 $38 Not Implemented
DL0191 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,032 $4,500 Not Implemented
DL0191 # 08 Y:2021 08 2021 INSTALL TIMERS AND/OR THERMOSTATS $687 $333 Not Implemented
DL0191 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $1,527 Not Implemented
DL0191 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,846 $1,500 Not Implemented
DL0191 # 11 Y:2021 11 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,536 $925 Not Implemented
DL0191 # 12 Y:2021 12 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,502 $22,000 Not Implemented
SU0504 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97 $0 Not Implemented
SU0504 # 02 Y:2021 02 2021 ELIMINATE/REDUCE AN OPERATION $515 $50 Not Implemented
SU0504 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $1,725 $882 Not Implemented
SU0504 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $421 $569 Not Implemented
SU0504 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $211 $371 Not Implemented