IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0299 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,491 $40 n/a
TT0299 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $809 $3,500 n/a
TT0299 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $750 n/a
TT0299 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $387 $100 n/a
TT0299 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $221 $90 n/a
NL0086 # 01 Y:2023 01 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,136 $100,000 n/a
NL0086 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $6,202 $6,211 n/a
NL0086 # 03 Y:2023 03 2023 METER WASTE WATER $4,239 $1,348 n/a
NL0086 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $573 $510 n/a
NL0086 # 05 Y:2023 05 2023 KEEP EQUIPMENT CLEAN $350 $450 n/a
NT0012 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,463 $4,553 Not Implemented
NT0012 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $4,568 $1,441 Not Implemented
NT0012 # 03 Y:2023 03 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $315 $200 Not Implemented
NT0012 # 04 Y:2023 04 2023 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $13,612 $0 Not Implemented
UC2309 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,070 $0 Implemented
UC2309 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $2,261 Implemented
UC2309 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $5,473 $22,421 Not Implemented
UC2309 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26 $35 Not Implemented
UC2309 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $155 $494 Not Implemented
UC2309 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $136 $38 Not Implemented
UC2309 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,846 $33,462 Not Implemented
UC2309 # 08 Y:2023 08 2023 INSTALL TIMERS AND/OR THERMOSTATS $666 $1,386 Not Implemented
UC2309 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $22,622 $192,621 Not Implemented
UA0275 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $2,032 $377 Implemented
UA0275 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,695 $11,361 Implemented