IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0468 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,406 $30,850 Implemented
UD0468 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $3,368 $3,000 Implemented
BD0036 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,238 $54,640 Implemented
BD0036 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,437 $12,950 Implemented
BD0036 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,970 $1,575 Implemented
BD0036 # 04 Y:1995 04 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,847 $5,000 Not Implemented
BD0036 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $5,009 $825 Implemented
BD0036 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,102 $6,784 Implemented
BD0036 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,059 $2,250 Not Implemented
AS0157 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,042 $11,866 Not Implemented
AS0157 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $1,741 Not Implemented
AS0157 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $944 $0 Implemented
AS0157 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,618 $550 Implemented
AS0157 # 05 Y:1995 05 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,897 $0 Not Implemented
AS0157 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $953 $658 Not Implemented
AS0157 # 07 Y:1995 07 1995 INSTALL TIMERS AND/OR THERMOSTATS $248 $600 Implemented
AS0157 # 08 Y:1995 08 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,816 $4,950 Not Implemented
AS0157 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $758 $2,100 Implemented
MA0346 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,905 $100,000 Not Implemented
MA0346 # 02 Y:1995 02 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $7,124 $30,000 Not Implemented
MA0346 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,744 $810 Not Implemented
MA0346 # 04 Y:1995 04 1995 REPAIR OR REPLACE STEAM TRAPS $619 $300 Not Implemented
MA0346 # 05 Y:1995 05 1995 USE MINIMUM STEAM OPERATING PRESSURE $552 $1,160 Not Implemented
MA0346 # 06 Y:1995 06 1995 CLOSE OFF UNNEEDED STEAM LINES $333 $0 Not Implemented
MA0346 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $700 Not Implemented