IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0005 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $4,816 Implemented
TT0005 # 03 Y:2007 03 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,206 $400 Not Implemented
TT0005 # 04 Y:2007 04 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $864 $4,080 Not Implemented
TT0005 # 05 Y:2007 05 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,002 $200 Implemented
TT0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $62,060 $50,000 Implemented
TT0005 # 07 Y:2007 07 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,808 $5,060 Not Implemented
TT0005 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $47,304 $2,000 Implemented
TT0005 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,245 $44,608 Not Implemented
SD0396 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,984 $280 Not Implemented
SD0396 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,283 $28,500 Implemented
SD0396 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,115 $200 Not Implemented
SD0396 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,509 $2,200 Implemented
SD0396 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $945 $1,000 Implemented
IA0408 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,366 $16,698 Implemented
IA0408 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $3,284 $1,309 Not Implemented
IA0408 # 03 Y:2007 03 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $215 $25 Not Implemented
IA0408 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $491 $700 Not Implemented
UM0320 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $20,841 $4,960 Not Implemented
UM0320 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,072 $0 Implemented
UM0320 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,725 $3,000 Not Implemented
UM0320 # 04 Y:2007 04 2007 REVISE SMOKE CLEANUP FROM OPERATIONS $11,829 $1,846 Implemented
UM0320 # 05 Y:2007 05 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,797 $0 Implemented
UM0320 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $10,572 $19,721 Implemented
UM0320 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,938 $500 Implemented
UM0320 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $825 Implemented