IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0729 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $3,244 Not Implemented
OK0728 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $35,971 $12,184 Not Implemented
OK0728 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $75,048 $240,000 Not Implemented
OK0728 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,567 $34,652 Not Implemented
OK0728 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,034 $1,994 Not Implemented
OK0728 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $430 Not Implemented
OK0728 # 06 Y:2006 06 2006 AIR CONDITION ONLY SPACE NECESSARY $6,517 $2,295 Not Implemented
OK0728 # 07 Y:2006 07 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,500 $0 Not Implemented
OK0727 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,431 $2,462 Implemented
OK0727 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,646 $75 Implemented
OK0727 # 03 Y:2006 03 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,463 $40,452 Not Implemented
OK0727 # 04 Y:2006 04 2006 USE GRAVITY FEEDS WHEREVER POSSIBLE $10,056 $1,636 Not Implemented
OK0727 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $8,407 Not Implemented
OK0727 # 06 Y:2006 06 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $117,767 $838,833 Not Implemented
OK0727 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,689 $7,635 Implemented
OK0727 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $676 $535 Not Implemented
OK0724 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $169 $495 Not Implemented
OK0724 # 09 Y:2006 09 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $28,864 $61,416 Not Implemented
OK0724 # 10 Y:2006 10 2006 USE COMPRESSOR AIR FILTERS $2,647 $642 Not Implemented
OK0724 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,211 $5,963 Not Implemented
OK0724 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $588 $322 Not Implemented
OK0724 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,492 $1,975 Not Implemented
OK0724 # 03 Y:2006 03 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,858 $4,100 Not Implemented
OK0724 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $380 $288 Not Implemented
OK0724 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $13,458 $0 Not Implemented