IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0346 # 08 Y:1995 08 1995 REDUCE SCRAP PRODUCTION $40,068 $56,350 Not Implemented
MA0346 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $14,227 $25,000 Not Implemented
OK0475 # 01 Y:1995 01 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,960 $1,800 Not Implemented
OK0475 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $3,553 Implemented
OK0475 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $50 Implemented
OK0475 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,280 $1,819 Implemented
OK0475 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $14,929 $30,000 Not Implemented
OK0476 # 01 Y:1995 01 1995 USE POWER DURING OFF-PEAK PERIODS $3,319 $0 Not Implemented
OK0476 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $90 Implemented
OK0476 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $655 Implemented
OK0476 # 04 Y:1995 04 1995 INSTALL SET-BACK TIMERS $553 $200 Implemented
OK0476 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,856 $36,000 Not Implemented
UF0128 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $836 $646 Not Implemented
UF0128 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,168 $750 Implemented
UF0128 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,643 $768 Not Implemented
UF0128 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $350 Implemented
UF0128 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,931 $4,920 Implemented
UF0128 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,330 $12,000 Not Implemented
UF0128 # 07 Y:1995 07 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,898 $100,000 Not Implemented
UF0128 # 08 Y:1995 08 1995 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $5,730 $7,000 Not Implemented
UF0128 # 09 Y:1995 09 1995 USE SOY OR WATER-BASED INKS $3,680 $0 Not Implemented
BD0035 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,345 $11,900 Implemented
BD0035 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,483 $3,900 Not Implemented
BD0035 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $997 $1,279 Not Implemented
BD0035 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $362 $300 Implemented