Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0310 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,634 | $87,759 | Implemented |
MI0310 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,676 | $640 | Not Implemented |
MI0310 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,210 | $2,400 | Implemented |
MI0310 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,522 | $1,660 | Implemented |
MI0310 # 07 Y:2017 | 07 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,771 | $3,140 | Implemented |
MI0310 # 08 Y:2017 | 08 | 2017 | PAY UTILITY BILLS ON TIME | $2,996 | $0 | Implemented |
MI0310 # 09 Y:2017 | 09 | 2017 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $1,743 | $1,756 | Implemented |
MI0310 # 10 Y:2017 | 10 | 2017 | INSTALL OCCUPANCY SENSORS | $1,537 | $5,036 | Not Implemented |
MI0310 # 11 Y:2017 | 11 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,321 | $1,310 | Not Implemented |
MI0310 # 12 Y:2017 | 12 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,128 | $2,500 | Not Implemented |
MI0310 # 13 Y:2017 | 13 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,107 | $1,700 | Not Implemented |
UF0506 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,263 | $5,454 | Not Implemented |
UF0506 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,519 | $1,169 | Implemented |
UF0506 # 03 Y:2017 | 03 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $4,067 | $3,216 | Not Implemented |
UF0506 # 04 Y:2017 | 04 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,070 | $1,171 | Not Implemented |
UF0506 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,010 | $6,500 | Not Implemented |
UF0506 # 06 Y:2017 | 06 | 2017 | INSTALL SET-BACK TIMERS | $1,014 | $667 | Implemented |
UF0506 # 07 Y:2017 | 07 | 2017 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $60,000 | $55,338 | Not Implemented |
MI0309 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $16,370 | $1,640 | Implemented |
MI0309 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $13,394 | $34,000 | Implemented |
MI0309 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,478 | $320 | Implemented |
MI0309 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $4,544 | $1,640 | Implemented |
MI0309 # 05 Y:2017 | 05 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,389 | $1,729 | Implemented |
MI0309 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,090 | $1,882 | Implemented |
MI0309 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,772 | $6,223 | Implemented |