IAC Assessment: MI0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Surgical Products
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 35,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,974 1,951,740 kWh $0.05
Electricity Demand $36,218 3,409 kW-months/year $10.62
Electricity Fees $25,377 - $ -
Fuel Oil #2 $59,451 2,512 MMBtu $23.67
TOTAL ENERGY COSTS $224,020
RECOMMENDED SAVINGS* $351,865 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,602
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$304,263
Cost:
$795,000
- - - - $59,451 2,512 $244,812 - -
-
kWh
-
-
kW-months/year
$59,451
2,512
MMBtu
$244,812
-
$
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$17,320
Cost:
$2,724
$13,177 248,614 $4,143 390 - - - - $13,177
248,614
kWh
$4,143
390
kW-months/year
-
-
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,427
Cost:
$320
- - - - - - $10,427 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,427
-
$
04: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$7,399
Cost:
$15,000
$5,806 109,557 $1,593 150 - - - - $5,806
109,557
kWh
$1,593
150
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,026
Cost:
$13,843
$3,050 57,551 $1,976 186 - - - - $3,050
57,551
kWh
$1,976
186
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$4,911
Cost:
$80
- - - - - - $4,911 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,911
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,191
Cost:
$2,240
$1,678 31,668 $513 48 - - - - $1,678
31,668
kWh
$513
48
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$328
Cost:
$826
$328 6,185 - - - - - - $328
6,185
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$351,865
Cost:
$830,033
$24,039 453,575 $8,225 774 $59,451 2,512 $260,150 - $24,039
453,575
kWh
$8,225
774
kW-months/year
$59,451
2,512
MMBtu
$260,150
-
$
TOTAL IMPLEMENTED Savings:
$47,602
Cost:
$35,033
$24,039 453,575 $8,225 774 - - $15,338 - $24,039
453,575
kWh
$8,225
774
kW-months/year
-
-
MMBtu
$15,338
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes