Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0386 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $205 | $254 | Not Implemented |
AS0386 # 05 Y:2004 | 05 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,680 | $2,000 | Not Implemented |
AS0386 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $437 | $850 | Not Implemented |
AS0386 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,758 | $35,730 | Implemented |
LE0196 # 01 Y:2004 | 01 | 2004 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,437 | $239,000 | Not Implemented |
LE0196 # 02 Y:2004 | 02 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $27,869 | $27,000 | Not Implemented |
LE0196 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,639 | $5,000 | Implemented |
LE0196 # 04 Y:2004 | 04 | 2004 | MINIMIZE WATER USAGE | $16,092 | $2,000 | Not Implemented |
LE0196 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,917 | $57,000 | Implemented |
LE0196 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,457 | $0 | Implemented |
LE0196 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $9,536 | $8,000 | Not Implemented |
LE0196 # 08 Y:2004 | 08 | 2004 | OPTIMIZE PLANT POWER FACTOR | $7,875 | $11,050 | Not Implemented |
LE0196 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,088 | $0 | Implemented |
LL0203 # 01 Y:2004 | 01 | 2004 | USE PHOTOCELL CONTROLS | $7,245 | $420 | Implemented |
LL0203 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,949 | $5,615 | Implemented |
LL0203 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,314 | $2,000 | Implemented |
LL0203 # 04 Y:2004 | 04 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $526 | $330 | Not Implemented |
LL0203 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $413 | $750 | Not Implemented |
LL0203 # 06 Y:2004 | 06 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $167 | $240 | Not Implemented |
LL0203 # 07 Y:2004 | 07 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,000 | $60 | Implemented |
LL0203 # 08 Y:2004 | 08 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,870 | $1,014 | Implemented |
MS0257 # 01 Y:2004 | 01 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $71,237 | $88,344 | Not Implemented |
MS0257 # 02 Y:2004 | 02 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $67,341 | $2,000 | Implemented |
MS0257 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $36,924 | $54 | Implemented |
MS0257 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,889 | $17,026 | n/a |