IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0386 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $205 $254 Not Implemented
AS0386 # 05 Y:2004 05 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,680 $2,000 Not Implemented
AS0386 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $437 $850 Not Implemented
AS0386 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,758 $35,730 Implemented
LE0196 # 01 Y:2004 01 2004 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,437 $239,000 Not Implemented
LE0196 # 02 Y:2004 02 2004 ADOPT IN-HOUSE MATERIAL GENERATION $27,869 $27,000 Not Implemented
LE0196 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,639 $5,000 Implemented
LE0196 # 04 Y:2004 04 2004 MINIMIZE WATER USAGE $16,092 $2,000 Not Implemented
LE0196 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,917 $57,000 Implemented
LE0196 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $10,457 $0 Implemented
LE0196 # 07 Y:2004 07 2004 UPGRADE OBSOLETE EQUIPMENT $9,536 $8,000 Not Implemented
LE0196 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $7,875 $11,050 Not Implemented
LE0196 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,088 $0 Implemented
LL0203 # 01 Y:2004 01 2004 USE PHOTOCELL CONTROLS $7,245 $420 Implemented
LL0203 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,949 $5,615 Implemented
LL0203 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,314 $2,000 Implemented
LL0203 # 04 Y:2004 04 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $526 $330 Not Implemented
LL0203 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $413 $750 Not Implemented
LL0203 # 06 Y:2004 06 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $167 $240 Not Implemented
LL0203 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,000 $60 Implemented
LL0203 # 08 Y:2004 08 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,870 $1,014 Implemented
MS0257 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $71,237 $88,344 Not Implemented
MS0257 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $67,341 $2,000 Implemented
MS0257 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $36,924 $54 Implemented
MS0257 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,889 $17,026 n/a