IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0442 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $366 $0 Not Implemented
UF0442 # 02 Y:2011 02 2011 INSTALL SKYLIGHTS $1,404 $3,128 Not Implemented
UF0442 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $527 $33 Not Implemented
UF0442 # 04 Y:2011 04 2011 INSTALL REPLACEMENT DOORS $588 $1,150 Not Implemented
UF0442 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,489 $1,079 Not Implemented
UF0442 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $168 $172 Not Implemented
UF0442 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $685 Not Implemented
UF0442 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,229 $0 Not Implemented
UF0442 # 09 Y:2011 09 2011 UPGRADE CONTROLS ON COMPRESSORS $648 $410 Not Implemented
UF0442 # 10 Y:2011 10 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,613 $0 Not Implemented
MI0207 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $123,852 $137,314 Not Implemented
MI0207 # 02 Y:2011 02 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $76,417 $150,000 Not Implemented
MI0207 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $61,926 $2,550 Implemented
MI0207 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $33,207 $8,474 Not Implemented
MI0207 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,901 $1,320 Implemented
MI0207 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,650 $9,200 Not Implemented
MI0206 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,265 $37,814 Implemented
MI0206 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,476 $44,779 Implemented
MI0206 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,977 $2,300 Implemented
MI0206 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,348 $50 Implemented
MI0206 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,064 $1,320 Implemented
MI0206 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,757 $2,400 Implemented
MI0206 # 07 Y:2011 07 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,108 $4,771 Implemented
MI0205 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,634 $38,332 Not Implemented
MI0205 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $8,973 $1,984 Not Implemented