IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0237 # 03 Y:1984 03 1984 REPAIR AND ELIMINATE STEAM LEAKS $1,730 $100 Implemented
CO0013 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $64 Implemented
CO0013 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,393 $300 Implemented
CO0013 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,230 $6,000 Implemented
CO0013 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $196 $128 Not Implemented
CO0013 # 05 Y:1984 05 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,228 $3,000 Not Implemented
GT0228 # 01 Y:1984 01 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,400 $5,000 Not Implemented
GT0228 # 02 Y:1984 02 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $3,900 $6,000 Not Implemented
GT0228 # 03 Y:1984 03 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,500 $1,654 Implemented
GT0228 # 04 Y:1984 04 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,292 $2,600 Not Implemented
GT0228 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $637 $500 Implemented
GT0228 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $2,100 Implemented
GT0228 # 07 Y:1984 07 1984 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,600 $3,000 Implemented
GT0236 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $49 $0 Implemented
GT0236 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $50 Implemented
GT0236 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,182 $0 Not Implemented
GT0236 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,004 $0 Implemented
GT0236 # 05 Y:1984 05 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,625 $5,000 Not Implemented
GT0236 # 06 Y:1984 06 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $356 $546 Implemented
GT0236 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,323 $2,000 Not Implemented
MA0008 # 01 Y:1984 01 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $79 $0 Implemented
MA0008 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $359 $209 Not Implemented
MA0008 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,034 $90 Not Implemented
MA0008 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $623 $1,079 Implemented
MA0009 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $2,206 $2,100 Not Implemented