Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,175
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0089 # 09 Y:1987 | 09 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $8,911 | $2,100 | Not Implemented |
CO0089 # 10 Y:1987 | 10 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,042 | $7,140 | Not Implemented |
CO0089 # 11 Y:1987 | 11 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,916 | $13,440 | Not Implemented |
CO0089 # 12 Y:1987 | 12 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,066 | $750 | Implemented |
CO0089 # 13 Y:1987 | 13 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,437 | $1,000 | Implemented |
CO0089 # 14 Y:1987 | 14 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,473 | $750 | Implemented |
CO0089 # 15 Y:1987 | 15 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $479 | $300 | Implemented |
CO0090 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $381 | $200 | Implemented |
CO0090 # 02 Y:1987 | 02 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $73 | $100 | Not Implemented |
CO0090 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $528 | $350 | Implemented |
CO0090 # 04 Y:1987 | 04 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $689 | $1,200 | Implemented |
CO0090 # 05 Y:1987 | 05 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $556 | $100 | Implemented |
CO0090 # 06 Y:1987 | 06 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $375 | $500 | Implemented |
CO0090 # 07 Y:1987 | 07 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,133 | $2,000 | Implemented |
CO0090 # 08 Y:1987 | 08 | 1987 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,147 | $1,350 | Implemented |
CO0090 # 09 Y:1987 | 09 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $65 | $90 | Implemented |
CO0090 # 10 Y:1987 | 10 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $1,000 | Implemented |
GT0310 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,060 | $300 | Not Implemented |
GT0310 # 02 Y:1987 | 02 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,080 | $2,000 | Not Implemented |
GT0310 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $220 | $140 | Not Implemented |
GT0310 # 04 Y:1987 | 04 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,325 | $2,375 | Not Implemented |
GT0310 # 05 Y:1987 | 05 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $582 | $2,216 | Not Implemented |
GT0310 # 06 Y:1987 | 06 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,930 | $41,000 | Not Implemented |
GT0311 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,040 | $4,000 | Not Implemented |
GT0311 # 02 Y:1987 | 02 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,940 | $90,000 | Not Implemented |