IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,263

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0256 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $2,768 $210 Not Implemented
LL0256 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $640 Implemented
LL0256 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $870 $90 Implemented
LL0256 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $700 Implemented
LL0247 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,342 $2,748 Not Implemented
LL0247 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,136 $1,373 Not Implemented
LL0247 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $151 Implemented
LL0247 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $527 $150 Not Implemented
LL0247 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $60 Implemented
LL0247 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $120 Implemented
LL0253 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $4,994,000 $250,000 Not Implemented
LL0253 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $658,473 $14,120 Implemented
LL0253 # 03 Y:2006 03 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $177,541 $24,000 Not Implemented
LL0253 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $169,857 $39,760 Implemented
LL0253 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $120,278 $11,880 Not Implemented
LL0253 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $67,882 $10,319 Not Implemented
LL0253 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,598 $8,750 Not Implemented
LL0255 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $76,757 $77,280 Not Implemented
LL0255 # 02 Y:2006 02 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $72,962 $24,500 Not Implemented
LL0255 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $32,476 $8,296 Not Implemented
LL0255 # 04 Y:2006 04 2006 REPAIR AND ELIMINATE STEAM LEAKS $16,453 $19,600 Not Implemented
LL0255 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,985 $30 Not Implemented
LL0255 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,638 $1,520 Implemented
LL0255 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $3,853 $1,320 Implemented
LL0255 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $700 Implemented