IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0052 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $4,908 $2,600 Not Implemented
ST0052 # 06 Y:1986 06 1986 INSULATE BARE EQUIPMENT $2,327 $600 Implemented
ST0052 # 07 Y:1986 07 1986 INSULATE BARE EQUIPMENT $2,695 $1,000 Not Implemented
ST0052 # 08 Y:1986 08 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $251 $700 Implemented
ST0052 # 09 Y:1986 09 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $200 Implemented
ST0053 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $500 Not Implemented
ST0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,959 $140 Implemented
ST0053 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $2,164 $250 Not Implemented
ST0053 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $100 Not Implemented
ST0053 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $1,204 $400 Not Implemented
ST0053 # 06 Y:1986 06 1986 INSULATE BARE EQUIPMENT $1,220 $650 Not Implemented
ST0053 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $554 Not Implemented
ST0053 # 08 Y:1986 08 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,913 $0 Implemented
UD0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,491 $38,950 Not Implemented
UD0190 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,737 $0 Not Implemented
UD0190 # 02 Y:1986 02 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,588 $10,000 Not Implemented
UD0190 # 04 Y:1986 04 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,631 $10,070 Implemented
KU0190 # 01 Y:1986 01 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,383 $50 Implemented
KU0190 # 02 Y:1986 02 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $215 $0 Implemented
KU0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $1,510 Implemented
KU0190 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,009 $600 Not Implemented
KU0190 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $120 Implemented
KU0190 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $10 Implemented
KU0190 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $50 Implemented
KU0190 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $207 $0 Implemented