IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0304 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,445 $875 Implemented
UM0304 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $11,910 Not Implemented
UM0304 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,372 $1,750 Implemented
UM0304 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $1,000 Implemented
UM0304 # 07 Y:2006 07 2006 COVER OPEN TANKS $810 $384 Implemented
UM0304 # 08 Y:2006 08 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $796 $325 Implemented
UM0304 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $594 $594 Implemented
UM0304 # 10 Y:2006 10 2006 COVER OPEN TANKS $327 $475 Implemented
LL0257 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $700 Not Implemented
LL0257 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,389 $90 Not Implemented
LL0257 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $182 $420 Not Implemented
LL0257 # 01 Y:2006 01 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $501,312 $98,000 Not Implemented
LL0257 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $302,971 $5,510 Not Implemented
LL0257 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,217 $7,960 Not Implemented
LL0257 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,875 $810 Not Implemented
LL0257 # 05 Y:2006 05 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $10,380 $18,000 Not Implemented
LL0257 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,404 $5,120 Not Implemented
LL0257 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $2,433 $450 Not Implemented
AS0424 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $6,478 $800 n/a
AS0424 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,125 $44,393 n/a
AS0424 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,418 $1,000 n/a
AS0424 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,909 $2,240 n/a
MS0297 # 01 Y:2006 01 2006 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $45,413 $160,000 Not Implemented
MS0297 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,548 $26,994 Not Implemented
MS0297 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $225 Implemented