IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0821 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,460 $1,000 Not Implemented
AM0821 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,780 $4,216 Not Implemented
AM0821 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,057 $12 Not Implemented
AM0821 # 06 Y:2021 06 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $425 $52 Not Implemented
CL2105 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,993 $55,908 Implemented
CL2105 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $25,163 $8,200 Implemented
CL2105 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,939 $1,120 Not Implemented
CL2105 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,819 $2,100 Implemented
CL2105 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $567,975 $4,358,847 Not Implemented
CL2105 # 06 Y:2021 06 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $63 $0 Implemented
CL2105 # 07 Y:2021 07 2021 USE OPTIMUM TEMPERATURE $81,375 $0 Not Implemented
CL2105 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,046 $7,102 Not Implemented
CL2105 # 09 Y:2021 09 2021 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $24,497 $17,450 Not Implemented
CL2105 # 10 Y:2021 10 2021 REPLACE TREATED WATER WITH WELL / SURFACE WATER $2,591 $600 Implemented
CL2105 # 11 Y:2021 11 2021 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $982 $3,050 Not Implemented
AS0509 # 01 Y:2021 01 2021 Install Anaerobic Digester $867,097 $4,989,249 Not Implemented
AS0509 # 02 Y:2021 02 2021 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $671,615 $272,000 Not Implemented
AS0509 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,608 $15,087 Implemented
AS0509 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $716 $2,286 Implemented
AS0509 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $634 $1,834 Implemented
AS0509 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $231 Implemented
BS0146 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,004 $1,690 Not Implemented
BS0146 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,336 $5,040 Not Implemented
BS0146 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $622 $1,174 Not Implemented
BS0146 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $159 Not Implemented