IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0436 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $961 $950 Not Implemented
KU0436 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,442 $155 Implemented
KU0436 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,335 $326 Implemented
KU0436 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,045 $765 Not Implemented
KU0436 # 09 Y:1994 09 1994 USE SYNTHETIC LUBRICANT $670 $510 Implemented
SF0035 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,298 Implemented
SF0035 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,720 $21,935 Not Implemented
SF0035 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,368 $900 Implemented
SF0035 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $116,693 $13,400 Not Implemented
SF0035 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $781 $0 Implemented
SF0035 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,453 $4,943 Implemented
SF0035 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $25,360 $12,000 Not Implemented
TN0525 # 01 Y:1994 01 1994 REPAIR OR REPLACE STEAM TRAPS $17,076 $780 Implemented
TN0525 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $6,276 $585 Implemented
TN0525 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $1,786 Implemented
TN0525 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,076 $480 Implemented
TN0525 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,625 $0 Implemented
TN0525 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $0 Not Implemented
TN0525 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,548 $510 Implemented
TN0525 # 08 Y:1994 08 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $271 $915 Not Implemented
TN0525 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $168 $345 Implemented
NV0008 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $3,956 Implemented
NV0008 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $1,493 $102 Implemented
NV0008 # 03 Y:1994 03 1994 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $876 $12,500 Not Implemented
NV0008 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,889 $900 Implemented