IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0286 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,469 $3,800 Not Implemented
AS0285 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $1,549 Not Implemented
AS0285 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,526 $7,394 Not Implemented
AS0285 # 03 Y:2000 03 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,513 $960 Not Implemented
AS0285 # 04 Y:2000 04 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $216,399 $200,000 Not Implemented
AS0285 # 05 Y:2000 05 2000 MODIFY STARTUP/SHUTDOWN TIMES $3,858 $120 Not Implemented
AS0285 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,339 $2,000 Not Implemented
AS0284 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,064 $2,486 Implemented
AS0284 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,003 $800 Not Implemented
AS0284 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,564 $3,800 Not Implemented
AS0284 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,270 $60 Not Implemented
AS0284 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $100 Implemented
AS0284 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $852 $60 Implemented
AS0284 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $315 $60 Implemented
AS0284 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $771 $60 Not Implemented
AS0284 # 09 Y:2000 09 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $14,280 $2,240 Implemented
AS0283 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,286 $7,561 Not Implemented
AS0283 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $128 Not Implemented
AS0283 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $1,024 $1,575 Not Implemented
AS0283 # 04 Y:2000 04 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $358 $60 Not Implemented
AS0283 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,045 $120 Not Implemented
AS0283 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $614 $696 Not Implemented
AS0283 # 07 Y:2000 07 2000 INSTALL AUTOMATIC STACK DAMPER $766 $594 Not Implemented
AS0283 # 08 Y:2000 08 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,159 $340 Not Implemented
AS0283 # 09 Y:2000 09 2000 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $287,576 $100,000 Not Implemented