Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0013 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $4,197 | $0 | Not Implemented |
IP0013 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Not Implemented |
IP0013 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $0 | Implemented |
IP0013 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,079 | $1,148 | Not Implemented |
IP0013 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $4,447 | $2,744 | Implemented |
IP0013 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,251 | $4,863 | Not Implemented |
IP0013 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $1,535 | Not Implemented |
IP0013 # 09 Y:2013 | 09 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,354 | $2,340 | Implemented |
IP0013 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,491 | $15,502 | Implemented |
IP0012 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,525 | $0 | Implemented |
IP0012 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,948 | $0 | Implemented |
IP0012 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,627 | $0 | Implemented |
IP0012 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,371 | $0 | Implemented |
IP0012 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,316 | $1,171 | Implemented |
IP0012 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $2,095 | $4,480 | Not Implemented |
IP0012 # 07 Y:2013 | 07 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $33,436 | $104,600 | Not Implemented |
IP0011 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,897 | $0 | Implemented |
IP0011 # 02 Y:2013 | 02 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $12,093 | $0 | Implemented |
IP0011 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,058 | $0 | Implemented |
IP0011 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,428 | $0 | Implemented |
IP0011 # 05 Y:2013 | 05 | 2013 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $980 | $0 | Implemented |
IP0011 # 06 Y:2013 | 06 | 2013 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $131,250 | $15,000 | Not Implemented |
IP0011 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,449 | $1,081 | Not Implemented |
IP0011 # 08 Y:2013 | 08 | 2013 | OPTIMIZE PLANT POWER FACTOR | $14,000 | $9,864 | Not Implemented |
IP0011 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,010 | $27,442 | Implemented |