IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0310 # 02 Y:2009 02 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,871 $150 Implemented
LL0310 # 03 Y:2009 03 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,546 $6,848 Not Implemented
LL0310 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $607 $30 Not Implemented
LL0310 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $500 $441 Implemented
UF0421 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $4,519 $1,280 Not Implemented
UF0421 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,204 $62,181 Not Implemented
UF0421 # 03 Y:2009 03 2009 INSTALL COMMON HEADER ON COMPRESSORS $2,293 $0 Implemented
UF0421 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $1,691 $11,790 Not Implemented
UF0421 # 05 Y:2009 05 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,680 $2,262 Not Implemented
UF0421 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,375 $8,700 Not Implemented
UF0421 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,873 $515 Implemented
UF0421 # 08 Y:2009 08 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,017 $0 Not Implemented
UF0421 # 09 Y:2009 09 2009 DEVELOP A REPAIR/REPLACE POLICY $2,717 $0 Not Implemented
UW0027 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,632 $10,324 Not Implemented
UW0027 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,650 $37,000 Not Implemented
UW0027 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $5,716 $871 Not Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
LL0310 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $360 $270 Not Implemented
UD0797 # 01 Y:2009 01 2009 RECOVER WASTE HEAT FROM EQUIPMENT $141,216 $250,000 Not Implemented
UD0797 # 02 Y:2009 02 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,511 $5,000 Not Implemented
UD0797 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,489 $48,750 Implemented
UD0797 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,395 $6,000 Not Implemented
UD0797 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,393 $75,000 Not Implemented
UD0797 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,034 $1,000 Implemented