Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0310 # 02 Y:2009 | 02 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,871 | $150 | Implemented |
LL0310 # 03 Y:2009 | 03 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,546 | $6,848 | Not Implemented |
LL0310 # 04 Y:2009 | 04 | 2009 | USE PHOTOCELL CONTROLS | $607 | $30 | Not Implemented |
LL0310 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $500 | $441 | Implemented |
UF0421 # 01 Y:2009 | 01 | 2009 | INSTALL OCCUPANCY SENSORS | $4,519 | $1,280 | Not Implemented |
UF0421 # 02 Y:2009 | 02 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,204 | $62,181 | Not Implemented |
UF0421 # 03 Y:2009 | 03 | 2009 | INSTALL COMMON HEADER ON COMPRESSORS | $2,293 | $0 | Implemented |
UF0421 # 04 Y:2009 | 04 | 2009 | INSTALL SKYLIGHTS | $1,691 | $11,790 | Not Implemented |
UF0421 # 05 Y:2009 | 05 | 2009 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,680 | $2,262 | Not Implemented |
UF0421 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,375 | $8,700 | Not Implemented |
UF0421 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,873 | $515 | Implemented |
UF0421 # 08 Y:2009 | 08 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $16,017 | $0 | Not Implemented |
UF0421 # 09 Y:2009 | 09 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,717 | $0 | Not Implemented |
UW0027 # 01 Y:2009 | 01 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,632 | $10,324 | Not Implemented |
UW0027 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,650 | $37,000 | Not Implemented |
UW0027 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $5,716 | $871 | Not Implemented |
UW0027 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,168 | $2,280 | Implemented |
UW0027 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
LL0310 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $360 | $270 | Not Implemented |
UD0797 # 01 Y:2009 | 01 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $141,216 | $250,000 | Not Implemented |
UD0797 # 02 Y:2009 | 02 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $61,511 | $5,000 | Not Implemented |
UD0797 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,489 | $48,750 | Implemented |
UD0797 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,395 | $6,000 | Not Implemented |
UD0797 # 05 Y:2009 | 05 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $23,393 | $75,000 | Not Implemented |
UD0797 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,034 | $1,000 | Implemented |