IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,721 $0 Not Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $230 Implemented
MA0282 # 08 Y:1993 08 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $235 $247 Not Implemented
GT0496 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,890 $750 Implemented
GT0496 # 02 Y:1993 02 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,200 $7,100 Not Implemented
KU0401 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,876 $3,250 Not Implemented
KU0401 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $575 $1,592 Not Implemented
KU0401 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $0 Not Implemented
KU0401 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,685 $6,000 Not Implemented
KU0401 # 05 Y:1993 05 1993 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,768 $0 Not Implemented
KU0401 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $417 $506 Not Implemented
KU0401 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $154 $165 Not Implemented
KU0401 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $328 Not Implemented
MA0281 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $8,868 $12,000 Not Implemented
MA0281 # 02 Y:1993 02 1993 UPGRADE CONTROLS ON COMPRESSORS $5,907 $4,000 Not Implemented
MA0281 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $3,492 Implemented
MA0281 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $400 Implemented
MA0281 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,812 $320 Implemented
MA0281 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $470 $387 Not Implemented
MA0281 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $436 $0 Implemented
MA0281 # 08 Y:1993 08 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $268 $80 Not Implemented
AS0091 # 01 Y:1993 01 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,875 $3,800 Not Implemented