IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0331 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $542 Implemented
AS0331 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $371 $63 Implemented
AS0331 # 07 Y:2002 07 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $398 $0 Not Implemented
AS0331 # 08 Y:2002 08 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $89,018 $19,710 Implemented
AS0331 # 09 Y:2002 09 2002 PAY BILLS ON TIME TO AVOID LATE FEES $819 $144 Implemented
GT0737 # 01 Y:2002 01 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,238 $5,018 Implemented
GT0737 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $193 $330 Not Implemented
GT0737 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $0 Not Implemented
GT0737 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $715 $2,240 Implemented
GT0737 # 05 Y:2002 05 2002 ELIMINATE/REDUCE AN OPERATION $530 $675 Not Implemented
GT0737 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,105 $4,013 Implemented
UM0219 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,674 $26,400 n/a
UM0219 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,965 $62,826 Implemented
UM0219 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $225 Implemented
UM0219 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $600 Not Implemented
UM0219 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $800 Implemented
UM0219 # 06 Y:2002 06 2002 REPLACE BOILER $3,920 $12,000 Implemented
UM0219 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $8,640 $5,940 Implemented
UF0304 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,492 $10,725 Implemented
UF0304 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,630 $0 Not Implemented
UF0304 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,432 $110,539 Implemented
UF0304 # 04 Y:2002 04 2002 UPGRADE OBSOLETE EQUIPMENT $265,075 $1,028,304 Not Implemented
UF0304 # 05 Y:2002 05 2002 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $7,014 $0 Implemented
UF0304 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,158 $1,895 Not Implemented
UF0304 # 07 Y:2002 07 2002 CHANGE OPERATING CONDITIONS $6,000 $472 Implemented