IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0400 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $37 $0 Not Implemented
MS0400 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53 $398 Not Implemented
MS0399 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,456 $31,953 Not Implemented
MS0399 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $4,013 $6,244 Not Implemented
MS0399 # 03 Y:2022 03 2022 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,256 $0 Not Implemented
MU0014 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,107 $30,064 Not Implemented
MU0014 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,203 $4,540 Not Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $6,530 $0 Not Implemented
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
MU0014 # 06 Y:2022 06 2022 USE OPTIMUM TEMPERATURE $1,469 $155 Not Implemented
MU0014 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $414 $349 Not Implemented
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
MU0014 # 09 Y:2022 09 2022 RECOVER WASTE HEAT FROM EQUIPMENT $91 $261 Not Implemented
NL0067 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $31,946 $130,000 Not Implemented
NL0067 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $25,304 $17,000 Not Implemented
NL0067 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,057 $45,606 Not Implemented
NL0067 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,500 $25,400 Not Implemented
NL0067 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,938 $2,000 Not Implemented
NL0067 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $6,637 $204 Not Implemented
LS2022 # 01 Y:2022 01 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $13,480 $0 Implemented
LS2022 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,287 $0 Implemented
LS2022 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $25,752 $2,900 Implemented
LS2022 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $645 $325 Implemented
LS2022 # 05 Y:2022 05 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,009 $1,785 Implemented