IAC logo
IAC Assessment: NL0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product Resistors
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3676 - Electronic Resistors
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 118,340
Annual Production 210,000,000 Pieces
Production Hrs. Annual 5,610
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $585,185 12,827,900 kWh $0.05
Electricity Demand $381,885 26,707 kW-months/year $14.30
Electricity Fees $26,997 - $ -
Natural Gas $48,011 6,594 MMBtu $7.28
TOTAL ENERGY COSTS $1,068,320
RECOMMENDED SAVINGS* $107,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$31,946
Cost:
$130,000
$22,405 487,056 $9,541 667 - - - - $22,405
487,056
kWh
$9,541
667
kW-months/year
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$25,304
Cost:
$17,000
$25,304 550,091 - - - - - - $25,304
550,091
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,057
Cost:
$45,606
$11,352 246,660 $6,784 474 $2,921 - - - $11,352
246,660
kWh
$6,784
474
kW-months/year
$2,921
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$15,500
Cost:
$25,400
$15,500 336,960 - - - - - - $15,500
336,960
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,938
Cost:
$2,000
$8,002 173,962 - - $(-864) - $(-200) - $8,002
173,962
kWh
-
-
kW-months/year
$(-864)
-
$
$(-200)
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,637
Cost:
$204
$6,637 144,288 - - - - - - $6,637
144,288
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$107,382
Cost:
$220,210
$89,200 1,939,017 $16,325 1,141 $2,057 - $(-200) - $89,200
1,939,017
kWh
$16,325
1,141
kW-months/year
$2,057
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost